# Do You Need a Permit to Build a Deck in Santa Maria, CA?

> Do I need a permit to build a deck in Santa Maria, CA? The small, low decks the city lets skip one, Orcutt's county rule, and the towns nearby.

URL: https://santamariadeckbuilders.com/guide/deck-permits-santa-maria/

# Do You Need a Permit to Build a Deck in Santa Maria?

The few decks Santa Maria lets skip a permit, why the same deck can be treated differently in Orcutt, and what the towns around it ask for.

## Quick Answer

In Santa Maria, yes, if the deck will be attached to your house, however close to the ground it sits. The only decks the city lets skip a building permit are small, low ones standing apart from the house, and not the one you walk onto from the door the house needs as its way out. Orcutt works differently: it's Santa Barbara County's rule there, and that rule turns on height and on what's under and over the deck.

## Which Santa Maria Decks Can Skip the Permit

Santa Maria keeps California's rule for decks.

### In Santa Maria, a deck can skip the permit only if

- It covers 200 square feet or less
- Every part of it sits within 30 inches of the ground
- It's freestanding, with nothing fastening it to the house
- It isn't the deck you step onto from the exit door the house is required to have

If even one of those isn't true, the deck needs a permit. Here's how that works out for a few decks you might have in mind:

- **A low deck at the back door.** It's fastened to the house, so it needs a permit, even when it sits a single step above the yard.
- **A small platform out in the yard.** If it's freestanding, small and low, and you don't walk out onto it from the house's required exit door, it can go without one. Height counts at every point, so on ground that slopes away, it's the point standing farthest above the ground that decides.
- **A bigger deck standing on its own.** Once a freestanding deck passes 200 square feet, it needs a permit however low it is.
- **A deck off an upstairs door.** That puts it well above 30 inches, so it needs one.

A deck that can skip the permit is still held to the building code.

## Why Orcutt's Rule Is Different

Orcutt is part of unincorporated Santa Barbara County, so a deck there goes by the county's rule, not Santa Maria's.

### An Orcutt deck needs the county's building permit if it

- Rises over 30 inches from the ground anywhere along it
- Has a basement or another story under it
- Supports a structure built above it
- Is used as part of an accessible route

There's no size limit in the county's rule, and nothing in it is about attaching to the house. So the same low deck can be treated two ways, depending on whether it's built in the city or in Orcutt.

- **A low deck fastened to the house.** In Santa Maria it needs a city permit. In Orcutt it can skip the county building permit, provided no part of it rises over 30 inches and none of the county's other conditions apply to it.
- **Large and low, out in the yard.** Past 200 square feet it needs a Santa Maria building permit, while in Orcutt it can skip the county building permit on those same terms.

Either way, the county's zoning rules can still decide where on your lot a deck can sit.

## Deck Permit Rules in the Towns Around Santa Maria

| Town | How it handles a deck |
| --- | --- |
| Guadalupe | The same building permit rule as Santa Maria |
| Grover Beach | The same building permit rule as Santa Maria |
| Lompoc | Any deck fastened to the house, or with a part more than 30 inches up, needs a city permit. Whether a smaller, lower one does is for the City of Lompoc's Building and Safety Division to decide. |
| Nipomo | Unincorporated San Luis Obispo County: at a single-family home, the same deck rule as Santa Maria, except the size limit is 300 square feet, not 200 |
| Arroyo Grande | The city's building division keeps its own standard designs for decks and balconies |
| Pismo Beach | A freestanding deck that stays within 30 inches of the ground at every point can be built without the city's building permit |

For a deck in Lompoc, Arroyo Grande or Pismo Beach, we check what that town asks for.

More on the deck itself: [Deck Building in Santa Maria](https://santamariadeckbuilders.com/deck-building/)

## Read Next

- [Do You Need a Permit for a Patio Cover in Santa Maria? &rarr;](https://santamariadeckbuilders.com/guide/patio-cover-permits-santa-maria/)

- [What It Costs to Build a Deck in Santa Maria &rarr;](https://santamariadeckbuilders.com/guide/new-deck-cost-santa-maria/)

- [Redwood or Composite for Your Deck &rarr;](https://santamariadeckbuilders.com/guide/redwood-vs-composite-decking/)

- [Deck Replacement &rarr;](https://santamariadeckbuilders.com/deck-replacement/)

## Which Town Is Your Deck In?

Start with your town, and roughly how big and how high you picture the deck. When we come by to see the spot, we'll tell you whether your deck needs a permit and which office it comes from. [Get Your FREE Estimate](https://santamariadeckbuilders.com/contact/)
